I’ve been quilting Easy Street this past week. I’ve got all the green patches running through the quilt all quilted and of the 16 blocks 6 of them are done. I FMQ’d daisies on the green patches and the blocks have a meandering loop de loop. I’ve taken it off the Bernina for the weekend so I can work on Hampton Ridge. I’m behind by 2 months on that BOM and the 3rd packet will be coming in a couple of weeks. My plan is to finish one of the packets this weekend which consists of 5 – 7″ blocks. It’s very doable unless I get bored in which case – I’ll do something else.
Happy Quilting!
~Melanie