Get It Done – October

My September List:

  • Hand quilt border #2 (of three) on the first quilt – I can’t believe I wasn’t able to finish this. I’m really almost done.  oh well, I’ll add this to October
  • Finish Block B and Piece all the blocks together for Easy Street – DONE! 
  • Next block (#9) for “Raining Cats and Dogs” – I have a few more pieces left to applique down and then I’ve got to embroider.  I’ll move this on to October. 
  • Month by Month – Put the story on it’s page; Quilt this on the Long Arm – I really want to quilt this on the long arm at a local quilt shop.  I keep going back and forth.  I’m planning on attending the certification class on 11/2 so we’ll see how far I’ve come with Easy Street and maybe I’ll still do this on a long arm. But we’ll see how I feel after I quilt down Easy Street.
  • Dresden Wall Hanging (25″ x 25″) – practice free motion quilting on my BerninaI decided I didn’t want to do this yet.  
  • First BOM – A Rainbow Garden starts in September! – Well I received the block but I’m still waiting on the thread.  I thought I had ordered it but the shop hasn’t charged my card and hasn’t notified me as to when I can expect it.  They haven’t even responded to my email.  Well, I’m a little busy with work right now so I’m not in any rush.  They may just send it with the October supplies.  Hopefully I get it at some point.  I was told that I could get the same stuff at PIQF at a better deal so if I do not receive it by then I’ll just buy all the thread I will need at PIQF. 
  • Road to Brenham quilt with Judy at Patchwork Times – get all the fabric – All the fabric has been washed and I started step 1.  But then I got side tracked by secret project #1 that I’ll post about when it’s not secret. 
  • Lucky Star BOM with Elizabeth at Don’t Call Me Betsy – December 2012 Practice Block – DONE!

My October List –

See more Get It Done posts at Patchworktimes.com

Leave a Reply