Tag Archives: Ricky’s Weasley Sweater

Ricky’s Weasley Sweater, Q2 Update

My goal for Q2 was to finish the front side and I’ve done it.

Ricky’s Weasley Sweater
The front side –
6/29/2020

Last quarter’s goal was to finish the back side.

Ricky’s Weasley Sweater
The backside –
4/21/2020

3rd Quarter’s goal is to put the front and back together and do the sleeves.

4th Quarter’s goal is to put it all together, the collar, and weave in all the ends.  I’m on track to getting this sweater finished by 12/25.  Then it can join the rest of the Weasley Sweater family and I can start on mine. 🙂

Kayla and Jacob in their Weasley’s
12/2019

~Always,

Melanie

Weasley Sweaters

So I have a long term goal that one Christmas my family (me, hubby and the kids) would take a family pic in our Weasley Sweaters.

I started with Kayla’s using Gryffindor colors first. At that point in my knitting life, Jacob was not interested in wearing any hand knits so I wasn’t about to invest a year of knitting for someone who didn’t appreciate it.  So Kayla’s was first.

Kayla’s Weasley Sweater
4/12/18

 

After Jacob saw the sweater he liked it and was okay with me making him one. And I spent 2019 making his. His is Ravenclaw colors: Blue and Gray (or silver).

 

 

Jacob’s Weasley Sweater
12/2019

So last Christmas, there were 2 –

Kayla and Jacob in their Weasley’s
12/2019

This year, 2020, I’m working on my hubby’s. I just finished the back:

Ricky’s Weasley Sweater
The backside –
4/21/2020

The color is washed out in this picture but it’s a blue/gray with a green stripe. It’s suppose to be Slytherin but the hubby didn’t want a green sweater. So I made it a gray/blue with a green stripe. The letter will be green and I plan to put green stripes in the front and on the sleeves.  The hubby ended up really liking the green but it’s Knitted Wit and I bought all the shop had (2-3 mini skeins) which would not have been enough for an extra large sweater.  I actually came close to ordering yarn for him and it was going to run close to $300.  Needless to say, he’s not planning on wearing this but once a year for our annual family Christmas picture. So, I just used the yarn I originally bought.

My goal is to get the front done in Q2, the sleeves done in Q3 and then sew it all up, knit the collar and weave in the ends  in Q4.  I’m a little behind since it’s already 21 days into Q2 but I hope I’ve given myself enough of a buffer in Q4 to still get this done in time for Christmas. 🙂

Hope you all are doing well!

~Melanie

My weekly update, 2/01/2020

So much has happened in the last 2 weeks. First I wasn’t able to post because of Road to California and all the shenanigans that happen there. I was exhausted on Sunday and spent the day resting. And that morning, Kobe Bryant and his daughter passed away in a helicopter crash. It’s heartbreaking and I continue to cry every day.  I cannot imagine what his wife and family are going through and I offer my prayers and hugs to them.

And here’s my update…

First, the week before Road:

I didn’t cross stitch at all that week, I did some knitting and that was it.  I went to yoga once.  That’s it. I played on the Bernina Q20 that Friday and quilted on practice sandwiches. At the end, I took out this table runner and quilted it. Now it’s done and all I have to do is bind it.

I also went to a featherweight maintenance class and now I have the knowledge I need to oil and service my featherweight!

On Sunday, I spent the day finishing up clue 3 on my scrappy quilt (no pictures because I was so busy sewing).  Time just goes by so fast. Then the week started up again.

So this past week, I was a bit more productive.  I cross stitched 4 of the 5 days and I finished the columns I was working on last time and now I’m on the next set of columns.

Mama’s Bukid
1/31/2020

I went to yoga once so I’m averaging about once a week.  Much better than not going at all but I’m striving for twice a week.

Next I accomplished my morning knitting on socks for 15 minutes every Monday – Friday.

1/18/2020

These babies are now done!

knit picks
scrappy socks
2/1/2020

All the ends are woven in and I started on my next monday morning socks:

Pattern: Jo’s perfect slipper socks
2/1/2020

 

Second, my evening knitting on Ricky’s Weasley Sweater every Monday through Friday.

Ricky’s Weasley Sweater
1/11/2020

I checked this off for 6 of 10 days.  Here’s an updated picture:

Ricky’s Weasley Sweater
about 14″
2/1/2020

It’s hard to see the green stripe but it’s still there.

I only worked on the Fairy Hill Shawl during knit night but that’s okay. I have about 7 rows left to do.

Fairy Hill Shawl
2/1/2020

I hope you all have a happy crafty week!

Melanie

To see the full 2020 crafty plan, click for quilting, knitting, cross stitch, and everything else.

My weekly update, 1/18/2020

I’ve done very little this past week.  It seems to have gone in a blur.  Last Saturday’s post I complained about being sick and not getting as much done as I wanted to and this week I do not even have the excuse of being sick.  I just had a lot of family and other obligations that kept me from crafting to my heart’s content.

Monday was my quilt guild meeting and it was a good meeting. I’m co-membership chair so I have a bunch of duties I needed to do to prepare for the meeting.  At least I was able to knit on my socks during the meeting.

On Tuesday, we went to the Los Angeles Clipper game and had a blast.

Wednesday, I was in Century City, and went with a friend to a yoga class.  Which was awesome!  I haven’t gone to yoga for almost a month and while the class kicked my butt I was very glad to go.

Thursday was knit night and it was my daughter’s last night with us before she headed off to college. So I went to knit night for a couple of hours before the family and I went to sushi for the girl’s last night.

And on Friday, we woke super early to get the girl to the airport for her early flight.  It was fine and at 1pm my parent’s called to say they were on their way to visit for the weekend.  I love that they are here visiting but my plan was to spend Friday sitting on my butt stitching.  Instead I had to run around getting them dinner.  I’m okay with it.

Anyway, that’s my busy week.  So what was I able to actually do?

First up – morning knitting on my socks for 15 minutes every Monday – Friday.

last week – 1/11/2020

 

I checked this off for 5 of 5 days.

1/18/2020

The cuffs are done and I’m working on the heels.  I have about 2 or 3 more rows on the heels and then I can kitchener it and call it a finish!  woohoo…

Second, my evening knitting on Ricky’s Weasley Sweater every Monday through Friday.

Ricky’s Weasley Sweater
1/11/2020

I checked this off for 1 of 5 days.  I only did about 2 – maybe 3 rows during knit night so any picture I take today will not be much different than what I showed last week.

I had dropped a stitch on my Fairy Hill Shawl and spent some time trying to fix it. Mindy spent more time on it but I didn’t get anymore done on it than that.  And I got another small blip done on my mix wave cowl.

Mix Wave Cowl
1/11/2020

For Cross Stitch, my goal is to work on it every evening Monday – Friday.

Mama’s Bukid
1/11/2020

I did nothing on this project all week.  🙁  So it looks the same. I wanted to finish up those columns last night but it will have to wait until my next free xstitch moment.

And finally Quilting! I was able to finish Glam Clam last weekend and posted about it during the week. But here it is again!

Glam Clam
Finished Top
1/13/2020

And finally for Sewing, the top and bottom of my Megan dress is put together and my next class is tomorrow. I’m excited to get that to the next step.

Megan Dress
1/11/2020

I guess I made small progress on some projects and no progress on others.  That’s okay. And I have a finished top so that is reason to celebrate.  I hope life calms down a bit over the next few months so I can get back into the rhythm of crafting, creating, and relaxing.

I hope you all have a happy crafty week!

Melanie

To see the full 2020 crafty plan, click for quilting, knitting, cross stitch, and everything else.

My weekly update, 1/11/2020

Now that the first full week is almost done, let’s do a quick check in to see my progress. To see the full 2020 crafty plan, click for quilting, knitting, cross stitch, and everything else.

To summarize, I have no specific goals other than to carve out time to craft on particular projects. This week, the first full week basically blew me out of the water because I got sick. So sick that I missed my minigroup get together on Monday, worked only part time Monday – Wednesday, and barely made it to knit night on Thursday.  I was able to do some things but not all things every day.

Monday – In addition to minigroup, I was supposed to go to yoga. I didn’t go. I also didn’t go on Wednesday or Friday.  🙁  I hope to change that next week.  I know yoga is not a craft but I need it to stay healthy and enjoy crafting.  So it’s part of my weekly “must do’s”.

First up – morning knitting on my socks for 15 minutes every Monday – Friday.

I checked this off for 4 of 5 days.  It doesn’t look it, but those tubes are about 15 inches long and I’m just starting the cuff.  There is no heel yet but I’ll be adding those on using the afterthought heel method when the cuffs are done.  I smell a finish coming…

Second, my evening knitting on Ricky’s Weasley Sweater every Monday through Friday.

Ricky’s Weasley Sweater
1/11/2020

I checked this off for 3 of 5 days.  It’s really hard to take a picture because it keeps rolling on itself and it’s on cables.  I did my best above and hopefully the colors come out right on your end.  It looks fine on my monitor.  His sweater is Slytherin but he did not like the idea of a green sweater so I made it gray with green.  It originally was supposed to just be a Green R but I wanted there to represent more green so included striping at the bottom of the sweater. I hope to also have stripes on the sleeves but that will depend on whether I have enough of the green.

I also did a couple of rows on my Fairy Hill Shawl which I still do not have a picture of. It’s because it’s all bunched up on cables and any picture I take will just be a jumbled mess.  And I did another blip on my mix wave cowl.

Mix Wave Cowl
1/11/2020

For Cross Stitch, my goal is to work on it every evening Monday – Friday.

Mama’s Bukid
1/11/2020

I checked this off for 4 of the 5 days and I’m almost done with the first 2.5 columns of these last 2 pages. There are 2 pages (a top and a bottom) and I want to finish 2 columns per month so I can get this long time project done and framed sooner rather than later.  I’m in the home stretch now because once I finish these columns I will only have 4 columns left!  And if I am on pace this will be done in March.  The problem as I’ve said in previous posts is that I’m not loving working on this project right now so it’s super hard to get myself to work on it.  I started these columns in December and didn’t even get halfway through the column.  Now, these are made up deadlines so if I take a month or two longer, it’s not a big deal.  🙂

And finally Quilting! My only schedule for quilting is to quilt all day Saturday but sometimes I work it in during the week.  So I was able to finish my Good Fortune Quilt!   I posted this picture recently but here it is again in all it’s glory.

Good Fortune
1/6/2020

It’s hard to see but the top is done and I have already put it away in my quilt queue.  Next up is Glam Clam and I’ve already started working on it today.  In fact, I finished another row.  I only have 1 row left and if I buckle down I might be able to get that one done today and have a second quilt top finished in January!  It’s stuck up under my sewing machine until I finish typing up today’s post so you get a picture of it “under the needle”.

Glam Clam
under the needle
1/11/2020

I do not actually have all day today as we are expecting friends for dinner this evening so I will need to end early to get ready for the socializing.

For Sewing, I just posted about this yesterday so it’s the same status.  But tomorrow is Sunday and normally Sunday is sew day.  Unfortunately, but fortunately, instead of sewing, I’ll be taking a quilting workshop with Mike McNamara offered through my quilt guild.  So I’ll be quilting tomorrow as well.  More on that later.

I hope you all have a happy crafty week!

Melanie