TGIF, 4/17/2015

WIPs Be Gone

WIP Status:

1. Month by Month – 

Month by Month - off the frame but sprawled on the floor  4/10/15

Month by Month – off the frame but sprawled on the floor
4/10/15

Still on the floor where I left it.

2. Tell It To The Stars

Tell It To The Stars Designing the back 3/5/15

Tell It To The Stars
Designing the back
3/5/15

I actually removed this from the design wall.  I’ll put it back up when I’m ready to actually piece the back together.

3. Scrapitude – I still need to do Clue #3 and Clue #4.  I’m not sure if I’ll get to this this weekend because I have something else on my projects list that I want to get done.

and for 4. Moon Glow -I’m super excited to have all the alternate blocks finished.  The next step is to piece all the rows together –

Moon Glow All blocks completed Up on the design wall 4/16/15

Moon Glow
All blocks completed
Up on the design wall
4/16/15

Whoop whoop!

Happy Quilting everyone!

Melanie

6 responses »

  1. What a dramatic quilt you are going to have. Well done! Thanks for linking to WIPs Be Gone – you’re wips are moving along.

Leave a Reply