Tag Archives: 2014 Quilty Goals

Quilty Goals: November 2014

Wow the month is over!  It went by so fast and even though I didn’t sew that much for a couple of weeks I was able to work on my priority projects.

 

Hampton Ridge Block 40 10/27/2014

Hampton Ridge
Block 40
10/27/2014

 

Hampton Ridge Block 41 10/29/2014

Hampton Ridge
Block 41
10/29/2014

October Goals:

  1. Tell It to The Stars – October clue – DONE!
  2. Moon Glow – Block #11 – DONE!
  3. Hampton Ridge – Month 9, 10, 11 – DONE for 9 and 10!
  4. Finish Quilting Flowers and Baskets* – I have 4 blocks left as well as all of the alternate locks and the border.
  5. Raining Cats and Dogs – work on this a little bit at a time. – I spent a couple of nights on this…
  6. Practice FMQ**
  7. Celtic Solstice – Step 5

My top three BOMs are almost done.  Tell It To The Stars are all put together… I think November’s clue is just going to be the border.  For Moon Glow, I’m all caught up and I’m just waiting for the next kit to come in the mail.  It should come any day and I keep checking my mail to see if today’s the day.  I’m really excited about Hampton Ridge because all of the blocks are done!  Woohoo!  It’s up on my design wall right now and I love looking at it throughout the day.

I was able to get a lot of the cutting done for Scrapitude 2015.  I’m finished with all the dark fabric and I’m halfway through the background fabric.  My goal is to get these cut before Grand Illusions start at the end of the month.

 

November Goals:

Top Priority Projects

  1. BOM – Tell It To the Stars by Judy Laquidara at Patchwork Times – November Clue!
  2. BOM – Moon Glow – Work on the alternate blocks when the kit comes in!
  3. BOM – Hampton Ridge – I have Month 11… work on Month 11, which is getting the sashing together and putting the body of the top together!
  4. Black Friday – Bonnie Hunter’s mystery quilt-a-long “Grand Illusions!” First clue is released.

My Wish List

  1. Quilt Flowers and Baskets
  2. Hand applique Raining Cats and Dogs
  3. cutting for Scrapitude 2015
  4. Celtic Solstice

~Happy Quilting!

Melanie

This Weekend’s line up

April Block  4/2/2014

April Block
4/2/2014

I finished quilting Easy Street!  Now all I need to do is get the binding and label on.  I have to go through my bins because I can’t remember if I bought binding and put it away or if that was something I was going to do later.  If I don’t like anything in my stash then I’ll have to go to the quilt shop this weekend to for something. And who doesn’t want to do that?

Other than that I’ve got May’s block for Tell It To The Stars I need to put together.  I also received the next kits for Hampton Ridge and Moon Glow.  My goal for this weekend is to just get the block for Tell It To the Stars done.  I really do not have time to do more than that.  If I find I do have time, I’ll try to get started on Moon Glow.  I like to stay on top of the BOMs I’m current on and right now I’ve got 2 kits waiting for me on Hampton Ridge.  That will have to wait for a weekend with MORE quilty time.  Maybe I’ll find that on Mother’s Day weekend.

Non Quilty plans for this weekend: The kids piano lessons got rescheduled for this morning, then I’ve got a yoga class.  After that I’m free so I may hit the quilt shop at that time until Game 7 of the Clipper/Warrior series this evening.  Tomorrow we’ll be heading over to Berkeley to check out UCB for the kids.  Its early for them since the kids are 12 and 9 but they’ve gone a bunch of times to UCLA, my alma mater.  I guess I should be fair and show them UCB is a good school too. 🙂 lol   All kidding aside, they haven’t been and while we’re in NorCal we’re playing tourists.

My sewing machine is waiting for me and if I want to get anything done to report on Monday, I better go join it. 🙂

…Gone Quilting….

Melanie

This Weekend’s line up

Moon Glow BOM Block 4 Finished  April 19, 2014

Moon Glow BOM
Block 4 Finished
April 19, 2014

This Saturday finds me with only 4 more blocks to go on quilting Easy Street AND borders.  I only have 4 days left and with my arm, wrist, and elbow giving me issues I’m not able to quilt that long.  Doing 1 block a day is about all that I’m capable of.  That means I only have enough time left in April to do the 4 blocks.  I do NOT have time to finish quilting the borders. Of course, I’ve only got the 4 side blocks to do which is much easier on me than the middle blocks so maybe I’ll be able to do more than 1 block a day.  We’ll see.  If I don’t get the borders quilted, I’m okay with that.  I made significant progress quilting Easy Street this month and I’m well on my way to getting it on my finished list for May.

I was able to get the backing pieced together for the Flowers and Baskets Quilt that has been on the UFO list since 2012.  So that’s a DONE on one of the items on my to do list for April.  I’m hoping to get it basted in May and is next in line to quilt once Easy Street is done.

The next item on April’s Quilty Goals is to get caught up with my BOMs: Moon Glow and Hampton Ridge

  • For Moon Glow – I finished Block 4 and I have Block 5 to do.  I’ll probably be getting the next block next week.
  • For Hampton Ridge – I finished 1 of 2 kits I had piling up here and I’ve only got the 2nd kit left to do.  Like Moon Glow, I’ll probably be getting that kit next week.  I know my card was charged yesterday so it’s probably in the mail already.

With that said, I’m not sure what I’ll be concentrating on this weekend.  Since both Moon Glow and Hampton Ridge BOMs are arriving next week, part of me wants to tackle those so that I’m not 2 steps behind for May.  Since I spent all of last weekend working on them, the other part of me wants to put those away and work on something else.  The other items on my April Quilty Goals list consist of:

None of these items excite me.  So, I may do something else entirely.  But then that’s too much effort for me right now (which is really why I have such a lengthy to do list :)).

Well, my sewing machine is waiting for me and if I want to get anything done to report on Monday, I better go join it. 🙂

…Gone Quilting….

Melanie