Okay. I’m changing my project rotation. Currently it is as follows:
- Raining Cats and Dogs – I put 1-2 pieces during the weekend.
- Celtic Solstice – I was consumed with finishing step 5, then started step 6.
I have the following still on my list but I haven’t gotten the mojo to do it yet:
- Moon Glow – prep the label and the back.
- Hampton Ridge – Get the borders on.
I haven’t moved forward on these is because I still have 2 quilts before Moon Glow ready to be quilted so I’m not in any rush to get Moon Glow to #3 on that list. The same goes for Hampton Ridge.
I’m finally ready to put Celtic Solstice aside and visit a different project. So here’s my new project rotation:
- Raining Cats and Dogs – continue doing what I’m doing, which is applique 1-2 pieces every weekend.
- Celtic Solstice
- Razzle – the Corduroy Quilt
- Missing Ivy
And for BOM Away Monday – I was able to get more of these Blocks done for Celtic Solstice.
And I was able to mark up the top of the final block of Raining Cats and Dogs.
I’m looking forward to a great week!
Check out more finished BOMs at
and design walls at Patchworktimes.com and 
Have a great week!
~Melanie













