Tag Archives: Lucky Star BOM

I finally have a REAL design wall!

Design Wall & BOM Away Monday

First, I’m linking to both Design Wall Monday and BOM Away Monday.  My design wall includes the finished Block 2 of the Hampton Ridge BOM that I finished early last week.

Hampton Ridge BOM Block 2 Completed  October 22, 2013

Hampton Ridge BOM
Block 2 Completed
October 22, 2013

But what I’m really happy and excited about are the wonderful changes my daddy made to my sewing room/office.

The wall is up!

The wall is up!

I brought this with me from Los Angeles but I didn’t think I had the room for it.  I really do not but this room has french doors and what you do not see is that the left side of the “wall” covers the right door.  I originally didn’t want to cover it.  But I wasn’t using the door but once in a while when I needed to move things in and out.  With the design wall, I can always remove it when I want to open the right door.

And that’s not the only thing my daddy put up!  He slapped some nails down and now I have a couple of places to hang my rulers.

Rules are up! Left side  of the closet/desk

Rules are up!
Left side of the closet/desk

Rulers on the right side.

Rulers on the right side.

I’ve still got the cork board I made a few months ago.  I just moved it to the right side of my desk.  You can’t tell in the picture as it just looks like every other picture I’ve taken of it.  But trust me, it’s on the right and it was moved. 🙂

And the cork board was moved to a different space.  My lucky star BOM is still unfinished there.

And the cork board was moved to a different space.
My lucky star BOM is still unfinished there.

The Lucky Star BOM is still unfinished as I wasn’t able to get much sewing done yesterday.

See more design walls at Patchwork Times and more finished BOMs at  .

Wish I was quilting.

Melanie

Enjoying the quilting process

Design Wall & BOM Away Monday

Design Wall 10/21/2013

Design Wall 10/21/2013

I’m linking to both Design Wall Monday and BOM Away Monday.  My design wall includes the finished Block 1 of the Hampton Ridge BOM that I finished early last week.

Hampton Ridge BOM Block 1 Completed  October 14, 2013

Hampton Ridge BOM
Block 1 Completed
October 14, 2013

I’ve got an unfinished block from Lucky Star BOM (January 2013) up there as well.  I’m working on that one a bit at a time it seems.  By the time I get to that block I’m at the end of my quilty time and I have just enough steam left to just do one of the parts.  I have a few more days to finish it before the end of the month so there’s no rush.  Really there is no rush at all.  It’s not like I need to have anything done by a certain time.  No one needs any of the quilts I make as soon as possible.  Obviously that’s different if I’m making a gift that has a deadline.  Which I haven’t done yet so no worries there.  Some times in the ever need to finish something to add to my blog or reduce my stash I feel a rush to get things done.  Or maybe it’s just the day and age where faster is better.  I have to remind myself to slow down and enjoy the process.  I’ll get done what I can but I want to make quality work, learn as I go and experience the pleasure of quilting – whether it is the sound of my sewing machine or the comfort of hand work.

See more design walls at Patchwork Times and more finished BOMs at  .

Wish I was quilting.

Melanie