Tag Archives: Raining Cats and Dogs

Stash Report – Week 38, 2015

Nothing in or out!  But a little progress was made on my various projects.  I was able to get the “No Dogs” sign appliqued on to Block 7 of Raining Cats and Dogs.

Raining Cats and Dogs Block 7 - at the moment 9/19/2015

Raining Cats and Dogs
Block 7 – at the moment
9/19/2015

Here’s a picture of the full block as it is now.  I’m trying to work on this one piece at a time on the weekends.  So today the plan is to get the dog’s tail on.

Raining Cats and Dogs Block 7 - at the moment block as a whole 9/19/2015

Raining Cats and Dogs
Block 7 – at the moment
block as a whole
9/19/2015

I was also able to get Hampton Ridge go from 6 rows to 3 rows.  The next step is to get it into 2 rows, then 1 piece!  I’m loving how this is turning out.  Once I get that inner top done, I’ll pull out the border fabric and start working on getting that on.

Hampton Ridge 3 pieces now 9/19/2015

Hampton Ridge
3 pieces now
9/19/2015

I worked a little bit on Celtic Solstice too but it’s just a bunch of HSTs and white triangles right now.  I need to be patient because here’s the part where my precision starts to slacken.  This is why I only do a few at a time because after about 20 of these things, they all start to blend together.  I took out the Corduroy Quilt – Razzle – yesterday but didn’t have a chance to actually do anything.  So today I’ll be adding it to the rotation.  Here’s the plan:

  1. At the pressing stations
    1. press the white fabric (because I still need to cut about 50 pairs of the 2″ triangles)
    2. press the random pieces I pieced together as leaders and enders between project yesterday
    3. press the Celtic Solstice pieces that are already have one of the white triangles pieced with an HST
  2. Go through Razzle and see where I’m at
  3. At the cutting station
    1. Cut the white fabric for the 50 pairs
    2. Cut for Razzle if I need to
  4. At the piecing station
    1. piece the white triangles to the HSTs for Celtic Solstice
    2. piece Razzle together.

Here’s the numbers this week:

Used this week: 0 yards

Used year to Date: -47 yards
Added this week: 0 yards
Added Year to Date: 87.08 yards
Net Added for 2015: 39.58 yards

see more stash reports atPatchwork Times

~Have a quilty week!

Melanie

Monday Madness – 09/7/2015

Happy Labor Day!

My design wall is still not up but I’m hoping that that will change today.  The hubby needs something for the project.

I continue to work on Moon Glow and I’ve made some progress since last week…

  1. Piece the strips (of the same fabric) together – DONE
  2. Cut each strip into 4 equal strips – DONE
  3. Piece fabric #1 with fabric #2 to create piece A – DONE
    • repeat for fabric #3 and fabric #4 to create piece B – DONE
    • repeat for fabric #5 and fabric #6 to create piece C – DONE

…. EXCERPT.. I spent Sunday pressing the strips, next I have to pin before piecing the next set…

Moon Glow From Left to Right Strip #7 Part C Part B Part A

Moon Glow
From Left to Right
Strip #7
Part C
Part B
Part A

  1. Piece A +B to create piece D
    • repeat for C and fabric #7 for piece E
  2. Piece D+E for 4 sets of borders
  3. Then connect top and bottom
  4. connect right and left
  5. finally, miter the corners

Last time I linked to BOM Away Monday was last June.  Since then here’s a quick update on the projects I highlighted on that post.

Row by Row experience – have not done anything with it.  The kits are in a box in my sewing room and I will get to it one of these days.

Here’s a quick update on my top 4:

Scrapitude – This is ready to be quilted.  I think I need batting but I’ll work on that once Bailey is in the living room and Tell It to The Stars is quilted.

Tell It To The Stars – This is ready to be quilted to.  I’ve got everything!  I just need to trim down the batting and backing and get it on the quilt frame.  Of course, I need to get Bailey and the quilt frame into my living room.

Moon Glow – Working on getting the borders on now.

Hampton Ridge – This is still in my project bag.  I believe the rows are done and all I have to do is piece the rows together.  Then I’ve got to get the border on.  I’m not sure though and will figure it out when I’m ready to take this project out.  With the way my sewing room is set up currently, I can only have 1 project out at a time.  But I think this will wait until the final block for Raining Cats and Dogs is finished.  I want to work on that once the borders for Moon Glow is complete.

Check out more finished BOMs at  and design walls at Patchworktimes.com and Cooking Up Quilts

Have a great week!

~Melanie

Stash Report – Week 18, 2014

 

Before I go on a rant … here’s my stash report.  Nothing in, Nothing used.  I’ve done a lot though working on my various projects.

Used this week: 0 yards
Used year to Date: 20.5 yards
Added this week: 0 yards
Added Year to Date: 54.5 yards
Net Added for 2014: 34 yards

see more stash reports at  Patchwork Times

On to my ramblings about yesterday…

From yesterday morning until this morning a drastic change in plans occured.  I can’t tell you why other than I got lazy!  Very Lazy!  The piano teach came a little late but that wasn’t a big deal.  I had it planned out that I would quilt until she came, work while she was here and then at 11am leave for yoga.  Well, that was going well but at 10:45 my niece came and she was actually nice to me!  So I couldn’t leave.  She was just too cuddly.  Or maybe I didn’t want to go to Yoga… I think it was a mixture of both. ha!  Anyways I told myself that I could go to the quilt shop and do all the things I wanted to do.  The game didn’t start until 7:30 so I had plenty of time.  It wasn’t until 2:45 that I made it out the door to go to the quilt shop with my daughter and at that time the freeway was jam packed!  I was surprised and dismayed.  There was no way I wanted to spend an hour or more to go to the quilt shop just for binding. So we went to Nothing Bundt Cakes and got bundtinis, which I’ve been craving for the past two weeks.  That was very bad – I didn’t go to Yoga AND we got Bundtinis!  By the time I got home, it was 4pm and I finished up this month’s block for Tell It To the Stars.  I realized as I was going through the process that I have a little process. I thought I’d share it with you today.

#1 – Print the instructions

20140504-090233.jpg

#2 – Sort the fabric so I remember which fabric is which.  Every month I tell myself to put labels on them to make it easier next month and I always forget.  Maybe now that I’ve mentioned this to the online community I may actually do it next month. 🙂

Tell It To The Stars Step #2 - Sorting the fabric

Tell It To The Stars
Step #2 – Sorting the fabric

#3 – Press and Cut

Tell It To The Stars Step #3 - Press and cut

Tell It To The Stars
Step #3 – Press and cut

#4 – Follow the instructions and piece, press, cut as instructed

and I forgot to take a picture for this step…

#5 – Waalllaaahhh – Done!

 

Tell It To The Stars May Block 5/4/2014

Tell It To The Stars
May Block
5/4/2014

 

And here’s all the blocks on the design wall:

Tell It To The Stars Design Wall  All blocks so far 5/4/14

Tell It To The Stars
Design Wall
All blocks so far
5/4/14

Sorry for the bad lighting, The design wall is not located in a very lighted area… I don’t really use it to design but to display my finished blocks! 🙂

I think that’s all I’ve got this weekend.  The block actually took longer than I had anticipated. There were more pieces than normal and I was working slower than normal.  I wanted the points to be precise.  This is actually my favorite block so far for this BOM.  The family and I are still heading over to Berkeley this morning and I’m hoping to run into a quilt shop or knitting shop somewhere.  We are taking BART to enhance the experience so I don’t know if I’ll walk by any such shops.  If so, my stash will take a bump next week.

~ being a tourist in Berkeley!

Melanie

Stash Report – Week 17, 2014

For this weekend’s line up, I ended up finishing block 2 of Raining Cats and Dogs!  I can’t take a picture yet because the sun is not out.  But as soon as it is, I’ll take one and edit this post.

Here’s what it looked like the last time I posted a picture.

Raining Cats and Dogs Block 2 as of 3/16/14

Raining Cats and Dogs
Block 2
as of 3/16/14

UPDATE – here’s a picture of the finished block

Raining Cats and Dogs Block 2 Finished 4/26/14

Raining Cats and Dogs
Block 2
Finished
4/26/14

By yesterday, I was finished applique’ing almost everything but the dog on the lower right.  I finished that and finished all the hand stitching.  Normally I do not do so much hand work in one sitting but I wanted it done and it was so close.  So I powered on.  And now it’s done.  YAY!  I’ve only got one more block to do for Raining Cats and Dogs – Block 7.  And then all the blocks are done.  In previous posts, I mentioned that I was thinking about quilting it the QAYG method because I wanted to be more careful with my quilting and with the quilt all pieced together it makes it harder to handle.  However, since I pulled the last block out, I took a look at the finishing kit.  I’m not sure it will work with that method.  I have time to think and examine it more while I finish block 7 so the option is still there while I consider the situation.  If I do end up FMQ’ing with the quilt all put together, it might be okay.  I’m getting a ton of FMQ practice on Easy Street!  🙂  And I’m watching Machine Quilting the Home Sweet Home Quilt with Frieda Andersen on Craftsy.  I’m not actually quilting anything but simply watching the class.  I’ve only watched the first few lessons but she has some great Glue Basting ideas.  I’ve only tried glue basting once with Ammabel’s Quilt.  I liked it because I didn’t have to pin and stuff.  I still had to do it on the floor because the only table I have is a folding table and the sides of it are too big to clamp down the quilt.  It was not as easy as I thought it would be but it was all my fault for not taping it down well.  So, Frieda Andersen suggested these huge clamps from Home Depot or any hardware store.  I’m definitely going to use this method when I get around to basting the Flowers and Baskets quilt.  When I first learned to baste, I was at my LQS in LA and we used big binder clips on a table.  We taped where the quilt didn’t reach all the way to the side.  First the backing wrong side up, batting, and the top right side up.  At each point we smoothed and smoothed until it was nice and flat.  Then we went through it with a long needle and CHEAP thread.  It took quite a few hours on my hand quilt.  Then at my next quilting class for Jacob’s quilt we pin basted.  We did almost the exact same method except we were told to use the floor if we didn’t have a table.  So I taped the quilt on the floor and pinned to my heart’s content.  When I was doing this, I didn’t care about scratching the floor and Jacob’s quilt was just slightly bigger than a crib quilt.  I used this method for awhile but by the time I got to Ammabel’s quilt I didn’t want to pin baste on my mom’s nice new floors.  I just started watching Craftsy classes and one of the classes I took suggested glue basting.  I can’t remember which one but it was one of the early classes (for me).  Even though I’ve been quilting for 8 years I still feel like such a noob at things.   But I’m always looking for better ways to do stuff.  Sometimes I buy things (ie. rulers, seam rippers, needles, scissors) that I think will make something go faster and sometimes it does.  But sometimes it doesn’t and it feels like a big waste of money.  However, that’s the quest of learning.

The plan for today is to work a little and then head over to sheep shearing day at Ardenwood, and hopefully we can get back home to catch the last half of the Clipper/Warrior game.  I’ll have to shift my quilting time to later this afternoon/early evening but the plan is to get my block of Easy Street quilted for today and then get started on the block I’ve got for Moon Glow.  It’s already waiting for me laid out on my sewing table.  🙂

Used this week: 0 yards
Used year to Date: 20.5 yards
Added this week: 0 yards
Added Year to Date: 54.5 yards
Net Added for 2014: 34 yards

see more stash reports at  Patchwork Times

~gone quilting!

Melanie

Stash Report – Week 3, 2014

I’ve been plugging along this week working on a bit of everything.  But nothing to add to the used list.  A bit of work on Raining Cats and Dogs, and Rainbow Garden.  Hampton Ridge Block 10 and most of Moon Glow block 2.  I’m hoping to get that done sometime this morning.

I am taking my sewing machine in to the shop.  It’s been acting a little funny – the thread has been snapping a lot lately and I’m not sure why.  It could be nothing but I’d rather be safe than sorry.  I’ve cleaned it to the best of my ability but I guess it needs someone to go in to all those tiny places I can’t reach.  This is a perfect time to take it in as I’ll be travelling this week for work and will not be at home to use it anyway.  Great news for my hand projects.  🙂

Used this week: 0 yards
Used year to Date: 4 yards
Added this Weeks: 0 yards
Added Year to Date: 14 yards
Net Added for 2014:10 yards

Well here’s to a great 2014!

see more stash reports at  Patchwork Times

~gone quilting!

Melanie

Update on “Raining Cats and Dogs”

I finally spent some time back on Raining Cats and Dogs.  I took a short break from it and have got a few pieces down since the last time I posted about it.  I’ve got the foundations of the house, 1 star and half of the cat on the roof.  I still haven’t attached this part with the top or the left “side bar”.

Raining Cats and Dogs Block 2 as of 1/10/14

Raining Cats and Dogs
Block 2
as of 1/10/14

Here is what it looked like last month with the top part laid down over the middle part.

Raining Cats and Dogs Block 2 as of 12/9/13

Raining Cats and Dogs
Block 2
as of 12/9/13

 

Thank goodness it’s the weekend as I’ve got some serious sewing to catch up on!

Quilting Now!

~Melanie

Raining Cats and Dogs, an update

I was able to applique a little bit while in LA but only a bit.  I did more last night.  I didn’t get as much done but with all the projects I’m working on, I’m okay with that. 

Raining Cats and Dogs Block 2 as of 12/9/13

Raining Cats and Dogs
Block 2
as of 12/9/13

I finished the doggy and I got part of the house down.

Raining Cats and Dogs Block 2 - a little closer  as of 12/9/13

Raining Cats and Dogs
Block 2 – a little closer
as of 12/9/13

Here’s a closer shot of the umbrellas and the top of the block.  I do not like how the doggy came out.  I was doing that part in the airport and it is not flat at all.  I really should have done the house since there aren’t any curves that require a whole lot of attention.

Raining Cats and Dogs Block 2 - close up of the kitty and doggy as of 12/9/13

Raining Cats and Dogs
Block 2 – close up of the kitty and doggy
as of 12/9/13

Here’s a real close up of the doggy.  I know it looks like the fabric on that side is just a little wonky – maybe because I didn’t lay it flat on the table?  No – it’s wonky because the doggy is not flat on the fabric.  The cat right next to it is flat and I’m really proud of that one.  But the dog was not done very well at all.  Oh well, you lose some you win some.  The doggy is a loss and the kitty is a win. 🙂  They both required detailed attention to get them done perfectly and with the doggy I didn’t have it.  Another learning lesson for me.

Linking up with A Quilting Reader’s Garden for Applique Tuesday.

Raining Cats and Dogs, an update and a pen review

The hubby and I are off to LA tomorrow.  I’ll be there for a few days.  He’ll be there through the weekend to catch up with friends and have some time doing what boys do.  I’d like to stay with him and meet up with the wives of the boys but I’ve got to head back to take the girl to her cheer comp on Saturday.  As I usually do when I head to LA, I prepped some hand work to take with me for the trip.  And right now, that hand work is Raining Cats and Dogs.  I considered doing something different like the Hawaiian Quilt from PIQF or getting some hexies together for the Flower Garden.  But I held off, I only have 2 blocks left on this quilt and there is no point in getting me sidetracked with an old UFO.  So I already started on Block 2  with a couple of umbrellas and a dog/cat combo a couple of weeks ago.

Raining Cats and Dogs top of Block 2 as of 12/2/13

Raining Cats and Dogs
top of Block 2
as of 12/2/13

All I have left here is the dog.  Now, I am off to LA with the hubby so I may not even touch this project.  However, there is the chance that I do and if I do – I know that this wouldn’t be enough for me to do in 3 days.  So, I had to prep the next few pieces for me to move on.

I pieced the backing for the main part of the block.  I have to digress and say that this block is huge!  From top to bottom, it’s about 18″ high.  It might be a little smaller as I’m just estimating and I don’t want to go to the other room to retrieve the accurate information from the pattern.  It’s part of the reason why I decided to do the top part separately from the main part.  The edges of the fabric unravels fairly easily so I didn’t want the ends to fray too much by working on it a lot.  This way, I can get parts done with a little less fray.   And even with all that, the backing isn’t really done.  I’ve got another 2.5″ to the left of fabric that I have to piece together.  But since nothing will be appliqued onto it, I’ve left it off for now.  Next, I traced the pattern onto the backing.

Raining Cats and Dogs Block 2 as of 12/2/13

Raining Cats and Dogs
Block 2
as of 12/2/13

Then I traced the next few parts onto their corresponding fabrics. I use the Frixion pen to trace.  I love this pen.  It puts on a dark clear line and when I want it gone, all I have to do is iron it.  Surprisingly, I heard from a number of people some negative comments about these pens.  I have a couple of issues but they work better for me than other marking tools.  I do not like the pencils because I often cannot see the line.  I do not like the light blue pen because when I want to remove it I have to spend so much time wiping it away.  It’s irritating.  But with the Frixion pens – all I have to do is iron.  The issues I have is that it seems to dry up faster than other marking tools.  The second issue is that after a little bit of using it on a lightbox, it’s harder to mark.  So I usually end up drawing and re-drawing and re-drawing to make sure I can see the line once I remove it from the lightbox.  Anyway, compared to the pencils and the light blue water pen, the Frixion pen is the best for me.

Raining Cats and Dogs Block 2 as of 12/2/13

Raining Cats and Dogs
Block 2
as of 12/2/13

It’s hard to see as the lighting wasn’t very good and I had to do these pictures in the dark with a flash.  But you can get the idea.  Now I’m ready for the plane trip and a few days without children. 🙂

Linking up with A Quilting Reader’s Garden for Applique Tuesday.

Manic Monday – 11/18/2013

Design Wall & BOM Away Monday

Rainbow Garden September 2013 Block Finished 11/17/13

Rainbow Garden
September 2013 Block
Finished 11/17/13

I finished this yesterday just in time to post this for today’s BOM Away Monday.

Close up of Block 1

Close up of Block 1

Here’s a close up.  I received the November kit last Friday so I’m only behind 1 month.  Hopefully I can get the October block together enough to bring to retreat this coming weekend.  It would be nice to get some pointers on how I’m doing on this project.

Design Wall 11/11/13

Design Wall
11/11/13

The design wall hasn’t changed so here’s the picture from last week.  At some point, I’ll be putting these blocks away while I work on Block 2 of Raining Cats and Dogs.  I’m not yet sure what I’ll put up there to replace these.  Probably the current BOMs in progress but if I get a lot of work done on Missing Ivy at the retreat – I may put that up there for inspiration.

See more design walls at Patchwork Times and more finished BOMs at  .

~Wish I was quilting.

Melanie

Holiday Monday – 11/11/2013

Design Wall & BOM Away Monday

Raining Cats and Dogs Block 6 Finished 11/10/13

Raining Cats and Dogs
Block 6
Finished 11/10/13

Block 6 of Raining Cats and Dogs finished early this month as planned as I worked on this all last week while out of town.  The rest of my projects took a break and I’m slowly getting back into the swing of things.

Design Wall 11/11/13

Design Wall
11/11/13

I decided to pull out all my finished blocks for Raining Cats and Dogs and put it on the wall to check it out.  The blocks are not placed in their respective spots in the finished quilt.  I just put them up on the wall wherever they fit.  There are only two more blocks left and I’m excited to be at this point.  This quilt has been hand project #2 for so long I’m happy to be done with it.

See more design walls at Patchwork Times and more finished BOMs at  .

~Wish I was quilting.

Melanie